HomeFreeBSD

- Use the proper constant in sched_interact_update(). Previously,

Description

  • Use the proper constant in sched_interact_update(). Previously, SCHED_INTERACT_MAX was used where SCHED_SLP_RUN_MAX was needed. This was causing the interactivity scaler to lose history at a more dramatic rate than intended.

Details

Provenance
jeffAuthored on Apr 4 2004, 7:12 PM
Parents
rG75fb4a530438: Add FBSDID. Use %ld to printf(3) a long (even if the number is small).
Branches
Unknown
Tags
Unknown

Event Timeline